samedi 22 novembre 2008

progress update

plumbing is in, template is made, garbage side is made..it will be a pull down angle system. like in a gas staition where you throw your coffee. pull the door towards you from the top as it falls forward and stops at the width of the garbage. he's working on the dishwasher box today. kid's are all runny noses and coughing. i take full blame..i take them to the gym with me 4 days a week. 20 pushups during zumba, 15minute abs class, but a long way to go..

template

putting in the plumbing



color choices:
floor or counter

floor or counter
i need help here..what should we put above this cabinet? the wall is not deep enough to make the cabinet flush..so we need to put a piece of trim along the backside of the cabinet so you don't see the back...we were thinking about putting open shelves up to the ceiling..making it the coffee station..putting mugs hanging down from the first shelf with a light source too. 2nd shelf for bread and fruit..3rd for a plant that flows down. shelves would be in a 1/2 hexagon shape to match the cabinet shape.

2 commentaires:

Jen James a dit…

What the heck happened to Antoine's hair?????

Jen James a dit…

And, I love the idea of the open shelves. Totally do it!